Leucadia
Wastewater District
Leucadia Pump Station Upgrade Project
Owner: Leucadia County Water District
Engineer: Dudek & Associates, Inc.
Summary of Work:
Under contract
with Western Summit Constructors, Inc., Southern Contracting Company
was responsible for the Electrical, Instrumentation, Controls, and
SCADA Communications for the Upgrade Project. Dudek & Associates,
Inc. and Moraes/Pham & Associates were the Engineers of record.
Work included demolition, excavation, trenching, rehabilitation or
modification of existing equipment and facilities, and improvements
and modifications to the Electrical and Instrumentation Systems. Major
items of work included the construction of a temporary By-Pass Pump
Station, renovation of the existing Pump Station, Wet Well, Odor Control
System, and relocation of the existing Surge Tank. The two (2) existing
San Diego Gas & Electrical Services were demolished and replaced
with a new updated Electrical Service to feed the new Pump Station,
existing Gafner Treatment Plant, existing Leucadia Water District
Administration Offices and provisions for Future District Office Complex.
Scope of Work:
Electrical:
"
Main Utility Service Switchboard "MSB" - 1600 Amp 480 Volt.
" Automatic Transformer Switch - 1200 Amp 480 Volt.
" Distribution Switchboard "LPS - 1200 Amp 480 Volt.
" Motor Control Center "MCC-1" - 600 Amp 480 Volt.
" Generator Circuit Breaker - 900 Amp 480 Volt.
" Active Harmonic Filter - 300 Amp 480 Volt.
" Four (4) Adjustable Frequency Drives - 200 Horsepower.
" Modifications to existing Convenience Outlets.
" Replacement of existing Lighting - Interior and Exterior.
" Extensive underground modifications to intercept and extend
existing electrical ductbanks, SDG&E Services, temporary provisions
for the By-Pass Pump Station.
" Maintain existing Motor Control Center and Distribution during
construction of temporary facilities and demolition exist wet well
and pump station.
Instrumentation
and Controls:
"
Modifications to the existing Pump Control Panel.
" Installation of new PLC Enclosure.
" Modification to existing Bubbler System.
" Provide Meter Vault Sump Pump Control Panel.
" Provide Ventilation Alarm Control Panel.
" Provide Wet Well Level Transmitters and Switch.
Communication:
"
SCADA modifications to existing system.
" PLC Programming and modifications to interface with existing
spread spectrum radio system.
" Provide hardware to existing PLC System to upgrade.
Major Subcontractors
used for Project:
"
Calibrated Controls, Inc. - Instrumentation and Controls
" Base9 Consulting - SCADA Communication and Programming

New
Electrical Service - Switchboard "MSB"

New
Motor Control Center, Distribution Switchboard, and Automatic Transfer
Switch in the existing Pump Station

New
Pump Station Control Panel

Modified
Pump Station Control Cabinet adjacent to the new Variable Frequency
Drive Units

New Overflow Basin Construction

New
SDG&E Transformer Pad and Main Switchboard "MSB" formwork
for new housekeeping pad

New
Overflow Basin construction and excavation

Existing
Generator rework remained in service during installation of new Equipment

Major
coordination required for installation of underground ductbanks and
new Manhole MH-1

Final
Modification to the existing Pump Room included installation of new
Vertical Turbine Pumps, Instruments and Controls, and Lighting Fixtures.